Give to your favorite local project in IMBA’s Dig In campaign and REI will match all donations up to $25,000!
MTB Project Logo

Dale Ball Central to Dale Ball North Connector

 3 votes

1.3 Miles 2.1 Kilometers


Singletrack

306' 93 m

Ascent

-158' -48 m

Descent

7,756' 2,364 m

High

7,484' 2,281 m

Low

7%

Avg Grade (4°)

15%

Max Grade (8°)

Unknown

Update

Trail connects the northwestern portions of the Dale Ball trail.

BC Rimbeaux

Overview

Description

This connector rides well in either direction. The description is from south to north beginning at Junction 11 and ending at Junction 5.

If you are coming from Junction 19, turn left at Junction 11. It's easy to miss this turn because of trees hiding the sign.

The first section of the trail is mostly downhill to the paved Hyde Park Road, and has a couple of fun and challenging switchbacks along the way. Just before the road at .7 miles, you'll have to cross a steep-sided arroyo, then climb the small embankment to the road.

After crossing the road, the rest of the trail is uphill, but quite rideable, in general. Sharp uphill corners provide the technical challenges.

At Junction 10, continue straight a short distance to the end of this connector at Junction 5.

Contacts

Rate Trail


   Clear Rating

3.3 from 3 votes


Get On-Trail Navigation

Send to Phone
Your Check-Ins

Check-Ins

none

Stewarded By


Trail Ratings

  3.3 from 3 votes

#11710

Overall
  3.3 from 3 votes
5 Star
0%
4 Star
33%
3 Star
67%
2 Star
0%
1 Star
0%
Rankings

#287

in New Mexico

#11,710

Overall
3 Views Last Month
170 Since Nov 8, 2013
Intermediate Intermediate

0%
50%
50%
0%
0%
0%

Conditions



Getting forecast...

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter