MTB Project Logo

Quarry Trail

 4.0 (3)

0.8 Miles 1.3 Kilometers


Singletrack

105' 32 m

Ascent

-60' -18 m

Descent

4%

Avg Grade (2°)

11%

Max Grade (6°)

1,205' 367 m

High

1,160' 354 m

Low

Shared By Eric Stull

Conditions


Unknown

Getting forecast...

A fast and flowing trail. One way or out and back.

Eric Stull

Dogs Unknown

Features -none-

Description

This trail begins off the first switchback of the French Connection Trail. Keep going straight instead of following the switchback down. You'll have to clear a tall log/rock obstacle intially followed by 2 small switchbacks with a wooden bridge in between. The rest of the trail is easier riding singletrack.

It ends in the gravel parking lot at the end of Hwy FA which gives access to the quarry.

You & This Trail


Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Your Check-Ins

Check-Ins

Jun 19, 2017
Bradley Dawson
Smooth trail, relatively few roots. No excruciating climbs but you can fly on this trail - careful, as it is fairly narrow. Fun & fast. 1.8mi

Trail Ratings

  4.0 from 3 votes

#6679

Overall
  4.0 from 3 votes
5 Star
33%
4 Star
33%
3 Star
33%
2 Star
0%
1 Star
0%
Rankings

#127

in Wisconsin

#6,679

Overall
12 Views Last Month
699 Since Aug 28, 2013
Easy/Intermediate Easy/Intermediate

0%
67%
33%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter