Adventure Projects is hiring an Android engineer to join us in Boulder, CO
MTB Project Logo

Vinton Pond Rd to Rattlesnake Hill Trail connector

 4.0 (1)

0.5 Miles 0.8 Kilometers


Singletrack

104' 32 m

Ascent

-1' -0 m

Descent

4%

Avg Grade (2°)

8%

Max Grade (5°)

624' 190 m

High

521' 159 m

Low

Shared By Kai Troester

Conditions


Unknown

Getting forecast...

First technical then climbing through switchbacks.

Kai Troester

Dogs Unknown

Features -none-

Description

This is a popular connector option on the southwestern side of the park. It starts out mildly technical with a few rocks and a short bridge but then transitions into smooth switchbacks.

Contacts

You & This Trail


Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Your Check-Ins

Check-Ins

none

Trail Ratings

  4.0 from 1 vote

#10240

Overall
  4.0 from 1 vote
5 Star
0%
4 Star
100%
3 Star
0%
2 Star
0%
1 Star
0%
Rankings

#186

in Massachusetts

#10,240

Overall
1 Views Last Month
64 Since Aug 17, 2013
Intermediate Intermediate

0%
0%
100%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter