MTB Project Logo

North side of this trail recently poured in concrete for the entire northern leg. The southern leg is asphalt with a crushed fine track running alongside it. this picture shows the Trailhead.

Rate Photo
     Clear Rating
  2.7 from 3 votes

North side of this trail recently poured in concrete for the entire northern leg. The southern leg is asphalt with a crushed fine track running alongside it. this picture shows the Trailhead.  

0 Comments

Nearby Photos

Nearby Trails

La Llorona River Park Trail…

1.2 mi 1.9 km
 1
Las Cruces, NM