MTB Project Logo

One of the harder sections in the WBCA trail network.


Your Rating: Rating Rating Rating Rating Rating      Clear Rating
Your Difficulty:
Your Favorites: Add To-Do · Your List
Zoom in to see details
Map Key

1.8

Miles

2.9

KM

Singletrack

190' 58 m

High

78' 24 m

Low

134' 41 m

Up

152' 46 m

Down

3%

Avg Grade (2°)

11%

Max Grade (6°)

Dogs Unknown

E-Bikes Unknown

Multi-Use Trail. Please yield to walkers, runners, and occasionally horses.

Description

TOT North is the first part of the TOT trail, one of the remaining sections of original Trail of Tears motocross loop. Although the north section is easier than the south section, it is still considered one of the tougher sections of the network. There are a number of steep rooty climbs and some fun descents.

The trail begins at Scott Rock and takes and immediate left after onto the rerouted climb which is a nice rocky up and down before crossing Maple Street for a nicely laid out switchback climb. If you prefer a straight shot up stay right immediately after Scott Rock for the original climb which was recently cleared of dead falls and debris.

Contacts

Shared By:

Cape Cod NEMBA

Trail Ratings

  3.5 from 2 votes

#21792

Overall
  3.5 from 2 votes
5 Star
0%
4 Star
50%
3 Star
50%
2 Star
0%
1 Star
0%
Trail Rankings

#266

in Massachusetts

#21,792

Overall
1 Views Last Month
1,329 Since Apr 23, 2015
Difficult Difficult

0%
0%
0%
0%
100%
0%

0 Comments

Weather


Current Trail Conditions

Unknown
Add Your Check-In

Check-Ins

Sep 13, 2021
Jamey Mossengren
Sep 23, 2018
David Howland
Jul 22, 2018
VECON Sports
Sep 11, 2017
John Work
Welcome

Join the Community

Create your FREE account today!
Already have an account? Login to close this notice.

Get Started